• Politics
  • Science
  • Sports
  • Technology
  • This Week
  • Trending
  • Video

Himalaya Post English
  • Home
  • Main News
  • Politics
  • Economy
  • Interview
  • Sports
  • Entertainment
  • International
  • | नेपाली संस्करण |

Select Page

Narayangarh-Butwal road section: 18-km blacktopped in eastern section

Posted by Himalaya Post | Dec 27, 2023

Narayangarh-Butwal road section: 18-km blacktopped in eastern section
544
SHARES
ShareTweet

Nawalpur- The task of blacktopping in the eastern section of Narayangarh-Butwal road stretch along the East-West Highway has gained momentum.

Blacktopping has completed in 18.5 kilometers out of 65 kilometers from Gaidnakot to Daunne in the eastern section. According to contract manager of the China State Construction Engineering Corporation Limited Rakesh Jha, one side blacktopping with sub-base, construction of large bridges and walls along the road stretch and rivulet banks are being carried out.

He informed that road expansion works are being carried out in a way to complete one-side blacktopping in 42-km section in next two months. He shared that emphasis has been laid on expediting the construction of big structures along the road.

“Four out of five kilometers in Daunne has been expanded by cutting the mountain area”, her said, adding, “Works are being expedited to complete soil cutting in remaining one kilometer section in next one month”.

Now the road expansion has gained momentum from Bhedabari to Jharahi khola of Gandakot as well as in Rajahar of Devchuli, Danda Bazaar of Kawaswoti and Kawaswoti Bazaar area.

Share:

PreviousNcell honours Sunaina with ‘Ncell Woman ICON ICT Award 2023’
NextHDL introduces Silver Oak : A New Addition to the Oak Family

Related Posts

Oli, Dahal discuss Cabinet reshuffle

Oli, Dahal discuss Cabinet reshuffle

March 13, 2019

Hinduism and Nepal-India relation

Hinduism and Nepal-India relation

April 18, 2023

State Assembly members blame the bill as repressive

State Assembly members blame the bill as repressive

January 27, 2020

Disaster Management’s 14th Joint Committee has been concluded

Disaster Management’s 14th Joint Committee has been concluded

March 16, 2022

Latest News

  • Mastermind of ‘Operation Sindoor’ Parag Jain Appointed RAW Secretary
  • Nepal-India Hold 16th Bilateral Consultative Group Meeting on Security Issues in Pune
  • WHO–IPD Team Reaches Chicken Pox-Affected Area of Surnaya Rural Municipality
  • International Yoga Day Celebration Concluded in Lumbini
  • Trump and Modi held a telephone conversation

Like us on Facebook

Himalaya Post

Himalaya Post

Himalaya Post

Publisher-

Logic Media Pvt. Ltd.

Address – Kathmandu-4, Baluwatar
Phone No. – 977, 01 – 4247105
www.himalayapost.com

Information Department Registration Certificate No. 172 / 073 – 74

Email –
[email protected], [email protected], [email protected]

Himalaya Post English News Portal published by Logic Media Pvt. Ltd.:

President / Principal Editor –
Lomash Chapagain

Managing Director / Editor –
Milan Bhandari

Advisor / Chief Editor –
Aagneya Sharma

Co-Editor –
Ramchandra Pandey

Desk / Correspondent –
Nirmal Koirala

Camera / Correspondent –
Krishna Khatri

Australia Correspondent –
Roshan Dahal

Visit our Nepali Edition Himalaya Post | Published by Logic Media Pvt. Ltd.