• Politics
  • Science
  • Sports
  • Technology
  • This Week
  • Trending
  • Video


Himalaya Post English
  • Home
  • Main News
  • Politics
  • Economy
  • Interview
  • Sports
  • Entertainment
  • International
  • | नेपाली संस्करण |

Select Page

Fluid landslide disrupts Narayangarh-Muglin road

Posted by Himalaya Post | Sep 16, 2020

376
SHARES
ShareTweet

The continuous fluid landslide has obstructed the Narayangarh-Muglin road section again. Police said that the road traffic has been disrupted with no let-up in the landslide at Ichhakamana rural municipality-6, Charkilo following the incessant rain.

Police Inspector of the Area Police Office Muglin Kanchan Tamang shared that the traffic along the road section has been disrupted since 6.00 am this morning due to recurrent flow of fluid. It was difficult to remove fluid debris from the road due to continuous rainfall through dozer was already available there to do so, Inspector Tamang added. Road traffic would be made smooth after clearing off the road following the let-up of rain.

“The fluid mudslide is continually taking place”, he said, adding that it may take a couple of hours to remove the debris but it has not yet started due to torrential rain. RSS

Share:

PreviousRaped adolescent girl commits suicide after justice denied
NextCultivating resilience, coping and getting going in Business

Related Posts

RSS presents provincial plans to Chief Minister Gurung

RSS presents provincial plans to Chief Minister Gurung

August 12, 2018

Bridge over Bheri almost in final stage of construction

Bridge over Bheri almost in final stage of construction

August 22, 2018

China to support in operation of direct flights between Chengdu and Bhairahawa

China to support in operation of direct flights between Chengdu and Bhairahawa

January 15, 2020

The interaction program with Indian filmmaker Dr. Dwivedi has wrapped

The interaction program with Indian filmmaker Dr. Dwivedi has wrapped

April 4, 2023

Latest News

  • Kantipur Max to Broadcast EPL for Second Straight Season
  • NADA Auto Show 2026 Preparations Complete, Exhibition to Begin Tuesday
  • Proton Opens Its 11th Showroom in Birgunj and Launches the All-New Proton e.MAS 5
  • SRM EV Sales Cross 1,111 Units in Nepal, VG Motors Sets 10,000-Unit Target
  • From Robots to EVs: Nepal’s Electric Vehicle Transition Takes Center Stage at NADA Auto Show

Like us on Facebook

Himalaya Post

Himalaya Post

Himalaya Post

Publisher-

Logic Media Pvt. Ltd.

Address – Kathmandu-4, Baluwatar
Phone No. – 977, 01 – 4247105
www.himalayapost.com

Information Department Registration Certificate No. 172 / 073 – 74

Email –
[email protected], [email protected], [email protected]

Himalaya Post English News Portal published by Logic Media Pvt. Ltd.:

President / Principal Editor –
Lomash Chapagain

Managing Director / Editor –
Milan Bhandari

Advisor / Chief Editor –
Aagneya Sharma

Co-Editor –
Ramchandra Pandey

Desk / Correspondent –
Nirmal Koirala

Camera / Correspondent –
Krishna Khatri

Australia Correspondent –
Roshan Dahal

Visit our Nepali Edition Himalaya Post | Published by Logic Media Pvt. Ltd.