• Politics
  • Science
  • Sports
  • Technology
  • This Week
  • Trending
  • Video

Himalaya Post English
  • Home
  • Main News
  • Politics
  • Economy
  • Interview
  • Sports
  • Entertainment
  • International
  • | नेपाली संस्करण |

Select Page

KMC removing structures, construction materials kept at open theatre

Posted by Himalaya Post | Feb 18, 2021

KMC removing structures, construction materials kept at open theatre
621
SHARES
ShareTweet

Kathmandu- The Kathmandu Metropolitan City (KMC) has started removing the construction materials and the temporary structures from Khula Manch, the open-air-theatre in the heart of the city.

Temporary sheds had been built and construction materials kept at the open-air-theatre, in connection with the reconstruction of the Durbar High School, damaged by the 2015 Gorkha Earthquake and new building of the Bir Hospital.

The Durbar High School has been rebuilt and the construction of the Bir Hospital’s building has also reached the final stage of completion. So, KMC has started removing the temporary sheds and the construction materials from Khula Manch.

KMC spokesperson Ishwor Man Dangol said the temporary structures and construction materials are being removed to clear the space for holding mass rallies and assemblies there after the streets started becoming the venues for holding such rallies and protest demonstrations thereby disturbing the traffic in recent days.

Save Heritage Campaign activists have been drawing the attention of KMC mayor Bidya Sundar Shakya on the need of vacating the Khula Manch at the earliest. RSS

Share:

PreviousTwo-year rhino found dead; death tally reaches 25
NextWeather forecast: possibility of rainfall beyond afternoon

Related Posts

India Started To Export Paracetamol in Foreign Countries

India Started To Export Paracetamol in Foreign Countries

April 18, 2020

NAC to conduct Kathmandu-Dubai chartered flight on Sunday

NAC to conduct Kathmandu-Dubai chartered flight on Sunday

August 21, 2020

Eleven persons arrested with muzzle loaders

Eleven persons arrested with muzzle loaders

October 15, 2020

Delay payment impedes insurance programme in Bharatpur hospital

Delay payment impedes insurance programme in Bharatpur hospital

January 24, 2020

Latest News

  • Mastermind of ‘Operation Sindoor’ Parag Jain Appointed RAW Secretary
  • Nepal-India Hold 16th Bilateral Consultative Group Meeting on Security Issues in Pune
  • WHO–IPD Team Reaches Chicken Pox-Affected Area of Surnaya Rural Municipality
  • International Yoga Day Celebration Concluded in Lumbini
  • Trump and Modi held a telephone conversation

Like us on Facebook

Himalaya Post

Himalaya Post

Himalaya Post

Publisher-

Logic Media Pvt. Ltd.

Address – Kathmandu-4, Baluwatar
Phone No. – 977, 01 – 4247105
www.himalayapost.com

Information Department Registration Certificate No. 172 / 073 – 74

Email –
[email protected], [email protected], [email protected]

Himalaya Post English News Portal published by Logic Media Pvt. Ltd.:

President / Principal Editor –
Lomash Chapagain

Managing Director / Editor –
Milan Bhandari

Advisor / Chief Editor –
Aagneya Sharma

Co-Editor –
Ramchandra Pandey

Desk / Correspondent –
Nirmal Koirala

Camera / Correspondent –
Krishna Khatri

Australia Correspondent –
Roshan Dahal

Visit our Nepali Edition Himalaya Post | Published by Logic Media Pvt. Ltd.