• Politics
  • Science
  • Sports
  • Technology
  • This Week
  • Trending
  • Video


Himalaya Post English
  • Home
  • Main News
  • Politics
  • Economy
  • Interview
  • Sports
  • Entertainment
  • International
  • | नेपाली संस्करण |

Select Page

Gandak Hydroelectricity Plant starts power production

Posted by Himalaya Post | Jan 3, 2020

428
SHARES
ShareTweet
Gandak Hydroelectricity Plant has started generating power.
The Plant was closed for about two months after India stopped sending water in the canal in course of the regular repair and maintenance works.
Power generation has been started in the third week of December after India released water in the Gandak canal on December 16, engineer at the Gandak Project Office, Anil Shah, said. The Plant has been generating nearly three megawatts power daily at present.
The Gandak Hydroelectricity Plant located at Suryapura of West Nawalparasi has been generating meager power than its full capacity for years. The Plant’s full capacity is 15 megawatts daily. Of the Plant’s three turbines, two have become completely dysfunctional as the machinery and equipment installed there have become old. Only the No 2 turbine is functional.
Turbine No 1 and 3 has been inoperable since 12 year and three years back respectively. The No 2 turbine that is generating power is also old and worn out and hence it cannot generate power to its full capacity. As per the Gandak Agreement signed between Nepal and India, only the Indian side is fully authorized to release or stop water to the west Gandak canal.

Share:

PreviousNC’s existence will be in peril if internal disputes persisted: Sujata Koirala
NextSnowfall, rain predicted across the country

Related Posts

India’s Environment Minister Yadav Calls for Global Cooperation to Protect Himalayan Ecosystems

India’s Environment Minister Yadav Calls for Global Cooperation to Protect Himalayan Ecosystems

May 16, 2025

Concept paper of ‘National youth vision-2025’ unveiled

Concept paper of ‘National youth vision-2025’ unveiled

February 7, 2020

Ncell New Year Offer : ‘Endless Combo Pack’

Ncell New Year Offer : ‘Endless Combo Pack’

April 20, 2022

Official Launch of Himalayan Securities Limited

Official Launch of Himalayan Securities Limited

April 28, 2024

Latest News

  • India Approves Up to 654 MW Power Export to Nepal Amid Electricity Shortage
  • SAARC CCI Calls for Stronger Trade and Investment Ties with UK and Commonwealth
  • Hyundai Nepal Launches Festive Drive 2083 with Attractive Discounts and Rewards
  • Germany Announces €8 Million Assistance Package for Nepal Following Bhotekoshi Floods
  • MPI Nepal Provides NPR 3.1 Million in Relief Support for Flood-Affected Communities in Rasuwa

Like us on Facebook

Himalaya Post

Himalaya Post

Himalaya Post

Publisher-

Logic Media Pvt. Ltd.

Address – Kathmandu-4, Baluwatar
Phone No. – 977, 01 – 4247105
www.himalayapost.com

Information Department Registration Certificate No. 172 / 073 – 74

Email –
[email protected], [email protected], [email protected]

Himalaya Post English News Portal published by Logic Media Pvt. Ltd.:

President / Principal Editor –
Lomash Chapagain

Managing Director / Editor –
Milan Bhandari

Advisor / Chief Editor –
Aagneya Sharma

Co-Editor –
Ramchandra Pandey

Desk / Correspondent –
Nirmal Koirala

Camera / Correspondent –
Krishna Khatri

Australia Correspondent –
Roshan Dahal

Visit our Nepali Edition Himalaya Post | Published by Logic Media Pvt. Ltd.